| |
You see, unlike other types
of building practices where bulk materials are simply dropped
off at the site without any pre-engineering or plans,
Lester® and Butler® structures come
pre-engineered, specific to your exact requirements and local
codes. Lester® buildings are delivered ready to
build, as complete building systems, right down to the last
piece of trim and screws.
But the pre-engineering of Butler®
and Lester® buildings starts long before we ever start
working with you on your specific building. Indeed, separate
components and connections, as well as their endless combinations,
are tested in a variety of full-scale tests at Butler's®
Research an Development Center in Grandview, MO.
|
|